14 April 2004
A PROJECT OF THE SAM RAINSY PARTY : CANAL
RESTORATION
in Koh Andaet commune, Srey Santhor
district, Kompong Cham province
I-
LOCATION
Commune of Koh Andaet, district
of Srey Santhor, province of Kompong Cham, located 80km North-East of Phnom
Penh, 10 km off Road # 6A. A cluster of 4 villages: Kbal Koh, Koki, Chong Koh,
Kroch Soeurch. The commune covers an area of 100 km2 of flat
land.
II- DEMOGRAPHY
Number of inhabitants in the
commune: 5,400. Population made up of farmers and their families.
III- ECONOMIC
ACTIVITIES
Rice farming, and
occasionally
1. during the
rainy season: vegetables, fishing;
2. during the dry season: sugar cane on a few plots of land.
IV- STRENGTHS
1- Large areas of flat land,
ideal for agriculture.
2- Possibility of irrigation by
channeling water from the Mekong River.
V- WEAKNESSES
1- No or very little
infrastructure.
2- Water control system in
derelict state, needing repair to provide irrigation for dry season farming,
which would allow additional cultures and a second rice crop to deal with
chronic food shortage.
VI- ASSISTANCE REQUESTED BY
FARMERS
Restoration of an old, abandoned
canal (see photo) in order to channel water from a lake nearby the Mekong River
to rice fields further away. The restoration work will allow 370 farmer families
to irrigate 250 hectares of rice fields, and help produce other crops in the dry
season.
VII- RATIONALE BEHIND THE CANAL RESTORATION
PROJECT (“Sda Prek”)
To allow the 370 families (about
2,000 persons) to be self-sufficient in food throughout the year, instead of
depending on hand-outs from some powerful but dubious people who treat them as
beggars, knowing that alms are always irregular, insufficient and contrary to
human dignity.
A. Before restoration
- Length:
..................................................... 1,531 m
- Depth:
...................................................... 0.40
m
- Width:
...................................................... 3.00 m
B. After restoration
- Length:
.................................................... 1,531 m
- Depth:
..................................................... 1.50 m
- Upper width:
........................................... 3.00 m
- Lower
width: ........................................... 1.50 m
Restoration Cost
|
No |
Description |
Unit |
Quantity |
Price ($) |
Amount ($) |
|
1 |
Excavation cost (engine) |
m3 |
5,167 |
0.6 |
3,100 |
|
2 |
Administrative cost |
|
|
|
300 |
|
|
Total |
|
|
|
UD$ 3,400.00 |
The work will be completed in
three weeks, before the rainy season (end of April/early May)